Why did it take so long for field work to get approved and paid? Before building anything, I ran an operations diagnostic at Acutech, a telecom site contractor with about 25 field engineers across three service lines. I mapped an 18-stage project pipeline and found approvals taking over a week against an intended one to two days, with 17 of 25 engineers needing active supervision.

02

02 · Product

TractaIQ turns that pipeline into a workflow: engineers capture site evidence on their phones, even offline, reviewers approve it in one queue, and client-ready acceptance reports come out without chasing paperwork.

03

03 · My role

I own the product: the diagnostic, the workflow design, and the build priorities.

04

04 · Features & outcomes

□ Pipeline
18 stages mapped
◆ Approvals
1+ week found
□ Field capture
Works offline

Pipeline. From the Acutech operations diagnostic.

Approvals. Against an intended one to two days.

Field capture. Evidence captured on site, reviewed in one queue.